Aircon Installation Pricing

Window Type AC

1HP - Php1,000.00 | 1.5HP - Php1,000.00 | 2HP - Php1,000.00 | 2.5HP - Php1,200.00

Inclusion
  • Site Inspection and Assessment

    • Verification of installation location, structural support, and power availability

  • Positioning and Installation of Unit

    • Proper placement and alignment of window-type AC unit on designated opening

  • Mounting and Securing

    • Installation of necessary brackets/support (if applicable) to ensure unit stability and safety

  • Sealing of Gaps

    • Application of sealant/foam to minimize air leakage and prevent outside air infiltration

  • Electrical Connection

    • Connection to existing power source (plug-and-play or nearby outlet)

    • Basic checking of voltage compatibility

  • Drainage Provision

    • Ensuring proper tilt and positioning for correct water drainage

  • Operational Testing

    • Testing of unit for cooling performance, airflow, and basic functions

  • Work Area Clean-Up

    • Removal of installation debris and ensuring a clean working area after completion

Wall Mounted Split Type AC

1HP - Php7,000.00 | 1.5HP - Php7,000.00 | 2HP - Php7,000.00 | 2.5HP - Php7,500.00

Inclusion
  • Site Inspection and Layout Planning

    • Assessment of installation location for indoor and outdoor units

    • Evaluation of piping route, drainage path, and power supply availability

  • Installation of Indoor Unit (Evaporator)

    • Mounting of unit on wall using standard mounting plate

    • Ensuring proper alignment, leveling, and secure installation

  • Installation of Outdoor Unit (Condenser)

    • Placement on existing bracket or floor-mounted location

    • Ensuring stable, vibration-free, and well-ventilated positioning

  • Refrigerant Piping Installation

    • Installation of copper tubing (standard length) with insulation

    • Proper flaring, tightening, and leak prevention

  • Drain Line Installation

    • Installation of drain hose with proper slope for smooth water discharge

  • Electrical Connection

    • Interconnection of indoor and outdoor units (control wiring)

    • Connection to existing power source (ready provision)

  • Vacuuming of System

    • Use of vacuum pump to remove air and moisture inside the system before operation

  • Refrigerant Leak Checking

    • Inspection of all connections to ensure no refrigerant leakage

  • System Testing and Commissioning

    • Full operational testing (cooling performance, airflow, controls)

    • Verification of proper system operation

  • Basic Finishing

    • Taping and minor arrangement of pipes for neat appearance

  • Work Area Clean-Up

    • Cleaning of installation area and proper disposal of debris

Ceiling Cassette Split Type AC

1HP - Php1,400.00 | 1.5HP - Php1,400.00 | 2HP - Php1,400.00 | 2.5HP - Php1,400.00

Inclusion
  • Comprehensive Unit Inspection

    • Assessment of unit condition, airflow performance, and visible issues prior to service

  • Dismantling of Decorative Panel and Components

    • Careful removal of panel board, filters, louvers, and accessible internal parts

  • Installation of Cleaning Cover (Catch Bag)

    • Use of professional-grade waterproof cleaning cover to protect ceiling, walls, and surrounding area

  • Deep Cleaning of Evaporator Coil (Fins)

    • Application of coil-safe cleaning solution and high-pressure washing to remove dirt, grease, and microbial buildup

  • Blower Fan / Turbo Fan Cleaning

    • Thorough cleaning of fan assembly to restore balanced airflow and eliminate contaminants

  • Drain Pan and Drain Line Cleaning

    • Removal of sludge and dirt accumulation

    • Pressurized flushing of drain line to prevent clogging and water leakage

  • Drain Pump Checking (if applicable)

    • Functional checking of drain pump operation to ensure proper water discharge

  • Air Filter Cleaning

    • Washing and sanitizing of reusable filters

  • Electrical Components Protection

    • Proper covering and safekeeping of electrical controls and wiring during cleaning process

  • Exterior Panel Cleaning

    • Cleaning and wiping of decorative panel and louvers for a clean finish

  • Reinstallation and System Testing

    • Proper reassembly of all components

    • Operational testing to verify cooling performance and airflow

  • Work Area Protection and Clean-Up

    • Ensuring no water leakage or mess during and after service

    • Final clean-up of work area